University of Guelph Engineering Complex Phase II

 

As part of the construction for Phase II the School Of Engineering will be vacating the Old Thornbrough section of the Engineering Complex.

Contractor: Melloul-Blamey Construction

Architect: Perkins & Will Canada

Phase II (approximately 52,000sq.ft. of renovation and $22.3M total project cost) will achieve the greatest utility of existing facilities by consolidating the dry lab and faculty spaces in the Richards Building, which will be gutted and retrofitted, while the core of the Thornbrough Building is being reconfigured as a unified wet lab area. These major renovations will accommodate the accumulating need for research and teaching spaces, design studios, and faculty offices as the expansion of the School of Engineering continues to unfold.